About Project:
Installation of power and data for new LED displays on ceiling of 900 shops. Installation of power and controls for hoists to lower for maintenance of LED displays.
Unusual Challenges: The project is in an occupied shopping mall with limited access to the common areas during the day. Material and tool deliveries are performed early in the morning a due to limited dock availability. There is very limited space for storage of tools or material.
Creative Solutions: We have worked different shifts to accommodate the shopping mall hours. All of the material is being stored In our warehouse and coordinated with the site foreman to be brought to the job as needed for installation.
Other Noteworthy Facts/Information: The project work for the LED displays Is being performed on a scaffold system that is 6 stories over the floor below.
Address/Location:
900 N. Michigan Ave.
Customer Name:
Mitsubishi Electric
Project Owner:
Pepper Construction
Project Cost:
$360,000.00
Estimated Completion Date:
11-24-2017